Grade 12.9 M4-M20 Extended Hex Socket Head Cap Screws DIN912 | CNXD

CNXD T2 Red Copper Hexagonal Nuts Metric Pure Copper Hex Nuts Electrical Grounding M3-M30 OEM Wholesale Factory Supply

CNXD T2 Pure Copper Hex Nuts are manufactured from T2 red copper, featuring precision metric internal threads and a standard hexagonal design. With excellent electrical and thermal conductivity, non-magnetic properties and good corrosion resistance, these nuts are suitable for electrical grounding, onshore marine fittings, water treatment systems, chemical processing and industrial fastening applications.

Key Features

  • High-Purity T2 Copper Material: Offers excellent electrical and thermal conductivity, making it suitable for grounding connections and electrical equipment assemblies.
  • Corrosion Resistance: Provides good resistance to freshwater and general atmosphere, suitable for mild chemical environments; not recommended for long-term seawater immersion.
  • Precision Metric Thread: Fully threaded hexagonal design with right-hand metric threads, available in M3–M30 sizes for versatile industrial assembly requirements.

Key attributes

ItemDetails
OE No.None
WarrantyNot specified
Place of OriginZhejiang, China
Product nameT2 Pure Copper Hex Nut
Brand NameCNXD
TypeHex Nut
Model NumberCustomized
Nut TypeHex Nut
MaterialT2 Pure Copper / Red Copper
Measurement SystemMetric
SizeM3-M30
Nut ShapeHexagonal
Body TypeHex
Thread CoverageFully Threaded
Thread TypeMetric Thread
Thread DirectionRight Hand
Surface FinishPlain / Custom
ColorRed Copper
PortNingbo / Shanghai
Physical PropertiesHigh Electrical Conductivity, High Thermal Conductivity, Non-Magnetic
Corrosion ResistanceGood corrosion resistance for freshwater and general atmosphere, not recommended for long-term seawater immersion
MOQ1,000 Pcs
ApplicationElectrical Grounding, Marine Equipment, Water Treatment, Chemical Industry, Food Machinery, Solar Equipment

Packaging and delivery

ItemDetails
Selling UnitsSingle item
PackagingCartons + Plastic Bags
MOQ1,000 Pcs
Delivery Time25-30 Days
Lead Time (1–1,000 pieces)25 days
Lead Time (1,001–5,000 pieces)30 days
Lead Time (5,001–10,000 pieces)35 days
Lead Time (> 10,000 pieces)To be negotiated

Get a Quote

    ✕

    Get a Quote

      ✕

      Download Catalog